High Efficiency Hot Melt Glue Stick Production Line
SEND INQUIRY NOW
1.The hot melt glue stick assembly line should be operated by experienced personnel after training. Generally, the main engine is not allowed to run under the condition of empty machine or without
heating or feeding, so as to avoid scratches on the screw and the screw barrel. In the case of power failure and shutdown, there is material in the barrel, and it should not be restarted. The barrel
should be heated at the specified temperature and then turned on to the specified temperature to avoid twisting the screw and damaging the gearbox and causing accidents.
2. The thrust bearing should be filled with high temperature grease (moC2) on schedule, the gearbox should be checked frequently, and new gear oil should be replenished when used to ensure the normal
operation and service life of the machine.
3. Attention should be paid to the cold mixing of raw materials for mixing and processing: the raw materials should be clean and free of debris. Strictly prevent metals, sand, small tools and other debris from
being mixed into the raw materials, which will damage the machine and affect the quality of products in the production process. If any abnormality is found in the equipment, it should be stopped for inspection
and repair.
4. Cutting machine The cutting machine should be filled with oil in each transmission part during operation to ensure smoothtransmission. Special attention must be paid to the safety of operators near the tool.