
Currently, the extruder has been manufactured and is being strictly assembled and commissioned in our workshop. The commissioning content includes:
• Electrical connection and control system commissioning
• Heating section temperature test
• Discharging system operation test
• Safety interlock function inspection
JCT's engineering team strictly follows the factory inspection standards to ensure that the equipment can run stably after delivery.