Strict acceptance, all passed
With the cooperation of JCT engineering department and quality inspection team, the customer tested the following items one by one on site:
✅ Weld inspection and structural parts grinding quality.
✅ Vacuum sealing performance test.
✅ Electrical system connection and electric control cabinet operation demonstration.
✅ No-load operation, blade speed, noise and other indicators detection.
✅ Appearance cleanliness and surface treatment process inspection.
Finally, the customer was very satisfied with the stable operation of the equipment, process details and convenient operation.